Commercial Permit Checklist
 |
 |
The following is the Minimum items needed to apply for a new commercial construction permit in the City of DeLand:
-Completed Tree Application
-Completed Permit Application
-All other relevant permits from Governmental agencies (if applicable) (FDOT, SJRWMD, County, etc)
The following information must be included on 3 signed/sealed (by a design professional) plans:
|  |
 |
All Permits
| |
|---|
| Parking Fire Access Vehicle Loading Driving/turning radius Fire hydrant/water supply/ Post Indicator Valve (PIV) Set-back/separation (assumed property lines) Location of specific tanks, water lines and sewer lines
|
2. Occupancy group and special occupancy requirements shall be determined | |
3. Minimum type of construction shall be determined (Table 503) | |
4. Fire resistant construction requirements shall include the following components | Fire-resistant separations Fire resistant protection for type of construction Protection of openings and penetrations of rated walls Fire blocking and draft stopping Calculated fire resistance
|
5. Fire suppression systems shall include | Early warning smoke evacuation systems Schematic Fire Sprinklers Standpipes Pre-engineered systems Riser diagram Same as above.
|
6. Life Safety systems shall be determined and shall include the following requirements: | Occupant load and egress capabilities Early warning Smoke control Stair pressurization Systems schematic
|
7. Occupancy Load/Egress Requirements shall include: | Occupancy load Gross Net Means of egress Exit access Exit discharge Stairs construction/geometry and protection Doors Emergency lighting and exit signs Specific occupancy requirements Construction requirement Horizontal exits/exit passageways
|
8. Structural requirements shall include: | Soil conditions/analysis Termite protection Design Loads Wind requirements Building envelope Structural calculations (if required) Foundation Wall Systems Floor Systems Roof Systems Threshold inspection plan Stair systems
|
9. Materials shall be reviewed and shall, at minimum include: | Wood Steel Aluminum Concrete Plastic Glass Masonry Gypsum board and plaster Insulating (mechanical) Roofing Insulation
|
10. Accessibility requirements shall include: | Site requirements Accessible route Vertical accessibility Toilet and bathing facilities Drinking fountains Equipment Special occupancy requirements Fair housing requirements
|
11. Interior requirements shall include: | Interior finishes (flame spread/smoke develop) Light abd ventilation Sanitation
|
| |
| Barrier requirements Spas Wading Pools
|
Electrical
| |
|---|
| Wiring Services Feeders and branch circuits Over current protection Grounding Wiring methods and materials GFCI’s
|
| |
| |
| |
| |
| |
| |
Plumbing
| |
|---|
1. Minimum plumbing facilities 2. Fixture requirements 3. Water supply piping 4. Sanitary drainage 5. Water heaters 6. Vents 7. Roof drainage 8. Backflow prevention 9. Irrigation 10. Location of water supply line 11. Grease traps 12. Environmental; requirements 13. Plumbing riser
| |
Mechanical
| |
|---|
| |
| Clothes dryer exhaust 25’ or booster Kitchen equipment exhaust Specialty exhaust systems
|
3. Equipment 4. Equipment location 5. Make-up air 6. Roof-mounted equipment 7. Duct Systems 8. Ventilation 9. Combustion air 10. Chimneys, fireplaces and vents 11. Appliances 12. Boilers 13. Refrigeration 14. Bathroom ventilation 15. Laboratory
| |
Gas
| |
|---|
1. Gas piping 2. Venting 3. Combustion air 4. Chimneys and vents 5. Appliances 6. Types of Gas 7. Fireplaces 8. LP tank location 9. Riser diagram/shut-offs | |
Demolition
| |
|---|
1. Asbestos removal 2. Historic
| |